Wherever the vehicles stop, we put the charging in.

Victus designs, installs and manages EV charging for hotels, car parks, wedding venues and retail sites — and for the industrial yards running electric vans and HGVs. You provide the ground. We handle the grid application, the groundworks, the hardware, the payments and every support call.EV charging for hotels, car parks, venues and depots. You provide the ground. We handle the grid, the groundworks, the hardware and every support call.

  • Hotels
  • Car parks
  • Wedding venues
  • Retail & leisure
  • Industrial yards
  • Van & HGV depots

A charge point is only an asset if somebody runs it properly.

Most sites don't fail because of the hardware. They fail because nobody owns the grid application, the tariff, the faults or the driver on the phone at 11pm. We take all of it.

Earns from ground you already own

Charging bays earn per kWh and give visitors a reason to choose you over the site down the road. On a working yard they cut the fuel bill instead — same hardware, different maths.

We own the grid problem

Capacity checks, DNO applications, load management, metering and half-hourly supply — handled by us, designed around the power you actually have.

One accountable partner

Survey, design, civils, install, commissioning, payments and maintenance under one contract. No finger-pointing between installer, operator and hardware supplier.

Public, fleet, or both

Contactless payment and clear pricing where the public charge; RFID, fleet cards and separate tariffs where your own vans and HGVs do. Both on one site if that is what you need.

Sites where charging earns its space.

If vehicles already sit still on your ground for half an hour or more — guests, shoppers, wedding parties, or your own fleet overnight — that time is worth electrifying. These are the sites we survey most.

All sectorsAreas we cover across the North East

Two ways to get chargers on your site.

Buy the hardware outright and keep every penny it takes, or split the cost with us and share what it earns, on a revenue split agreed for your site. Both include design, install, commissioning and ongoing management — the difference is who owns the kit and who carries the spend.

Shared Investment

You cover the groundworks, we cover the hardware and the running of it. What the chargers earn gets split.

Split costAgreed at survey
  • You cover civils and groundworks; we cover hardware and back office
  • A share of revenue paid to you on every kWh delivered
  • Maintenance, monitoring and driver support included throughout
  • Input into tariff strategy and bay layout
  • Ideal for multi-bay rollouts and phased car park installs
Get a shared-cost proposal

Owned & Managed

You buy the chargers outright and keep every penny they take — or save every penny they save you. We install and look after them.

One-offQuoted per site
  • You own the assets and set your own tariff
  • 100% of charging revenue, paid out monthly
  • Fixed-fee management, monitoring and maintenance plan
  • Payment processing, reporting and driver support included
  • Ideal for depots, yards and sites with capital available
Request a hardware quote

Compare the packages in detailHow much can a site earn?

Revenue splits, term lengths and contributions are agreed per site after survey — they depend on bay count, available power, expected utilisation and hardware mix.

From first call to first charge.

A typical site runs 6–12 weeks from survey to switch-on. Grid capacity and groundworks are what move that number — we tell you which one you're facing at survey stage, not halfway through.

01

Discovery call

Fifteen minutes on your site, bay count, visitor profile and what you want charging to do for the business.

02

Site survey & power check

We visit, measure available capacity at your incoming supply, walk cable routes and confirm what can be installed without an upgrade.

03

Design & package proposal

Bay layout, hardware spec and a written proposal against both packages, with indicative revenue and timescales.

04

Grid application & civils

We handle the DNO application where one is needed, plus trenching, ducting, groundworks and any signage or bay marking.

05

Install & commissioning

Qualified electrical install, testing, certification and connection to the back office. Most sites stay open throughout.

06

Go live & manage

Chargers go live on the public network with contactless and QR payment, remote monitoring, driver support and monthly reporting.

How it works, step by stepGrid capacity and DNO applications

Specified for the dwell time you actually have.

An overnight hotel bay, a wedding car park and an HGV yard are three different problems. We spec AC where vehicles sit for hours, DC where they don't, and often a mix of both on one site.

Destination charging

AC · Type 2 · 7kW–22kW

Floor-mounted posts and twin-socket pedestals for stays of two hours or more. Cheapest per bay, lowest power draw, easiest to scale across a car park. Our most popular unit is the Victus 22kW dual pedestal.

  • Single or twin socket, tethered or untethered
  • Up to 22kW per connector on three-phase supply
  • Dynamic load management across multiple units
  • Ideal for hotels, venues, workplaces, overnight fleet charging

Rapid & ultra-rapid

DC · CCS & CHAdeMO · 60kW–180kW

Floor-standing rapid units for short stops — and for electric vans and HGVs that need turning round fast. Higher install cost and power requirement, far higher throughput per bay.

  • Dual-connector units, power-shared or full output
  • Large display, contactless reader, session receipts
  • Typically 20–40 minutes to 80% for most EVs
  • Ideal for retail, trunk-road sites, car parks and depots
Contactless card payment QR pay-as-you-go — no app required OCPP-compliant back office Dynamic load management RFID & fleet card access Your branding on the unit Live session & revenue reporting

The kit we actually install.

Every unit we install is floor-mounted. Our most popular is the Victus 22kW dual pedestal: two Type 2 outputs, so two cars charge at once, connected to our back office. We also install single-socket AC posts and rapid DC units, specified at survey against your supply and your dwell time.

  • Outputs2 × Type 2
  • PowerUp to 22kW per output
  • SupplyThree-phase
  • Start a sessionApp or RFID card
  • Back officeOCPP 1.6J
  • Rated-30°C to +55°C
The Victus 22kW dual floor-standing charger
The Victus 22kW dual floor-standing charger
An Audi e-tron charging at a Victus dual 22kW pedestal in evening light A Victus pedestal at dusk with its status light glowing An electric car plugged in to a Victus dual 22kW charger

Nobody on your team has to become an EV expert.

Every Victus charger reports back to our platform. We see faults before your guests do, reset units remotely, and put a support number on the charger so calls come to us — not to your reception desk.

  • Charger status and fault alerts come to us, not to you
  • Remote reset and diagnostics before an engineer is ever sent
  • Driver support handled by us at hello@victuscharging.com
  • Monthly reporting on sessions, energy delivered and revenue
  • Tariff and idle-fee policy reviewed with you, not imposed on you
Support sits with us, not your front desk Every unit carries our contact details and its own station ID.
Station reference
Printed on the unit — e.g. VC‑1
Payment
Contactless card or QR — no app, no account
Idle fee policy
Displayed on the charger before a session starts
Faults
Reported to us, triaged remotely, engineer booked if needed

What could your bays turn over?

Move the sliders to sketch a rough picture, including the revenue share, which we agree per site. Real figures come from your survey — utilisation is the number that decides everything, and we model it properly using your visitor data.

Indicative monthly return to you
£0
Annualised£0
Energy delivered / month0 kWh
Total site turnover / month£0
Sessions / month0

Illustrative only. Excludes electricity cost, standing charges, payment fees and VAT, and assumes a constant tariff. On the split-cost package your share is paid net of running costs; on owned sites you keep gross revenue and carry the energy cost.

Open the full estimatorWorked earnings examples

The awkward ones, answered.

It depends which package you take. On the split-cost package you pay for the groundworks and we cover the hardware and the back office, then we share what the chargers earn. On the owned package you pay for everything up front and keep all of it. We put both side by side in writing after the survey, with the numbers for your site rather than a generic table.

Often not. Most sites have more spare capacity than they think, and load management lets several chargers share what's available without tripping your supply. Where a DNO upgrade genuinely is needed we handle the application and tell you the cost and lead time before you commit to anything.

Cable routes are planned at survey to keep trenching short and away from your busiest routes. Most installs are a few days on site, phased so the car park stays open. Reinstatement, bay marking and signage are part of the job, not an extra.

On owned sites, you do. On split-cost sites we set it with you — it has to stay competitive with nearby chargers or utilisation drops and nobody earns. Idle fees, free-charging windows for guests, and separate tariffs for staff, wedding parties or your own fleet can all be configured.

We usually know before you do. The unit reports its status to our platform, we attempt a remote diagnostic and reset, and if it needs an engineer we book one. Drivers contact us, not your staff — support details are on the charger itself.

No. They tap a contactless card or scan the QR code on the unit to pay as they go. RFID cards and account access can be added for staff, fleets or regular users where you want them.

For most standard installs in existing car parks, permitted development covers it. Listed buildings, conservation areas and larger rapid installations with substation works can need consent — we flag it at survey and tell you what's involved.

Yes. Units can be wrapped or vinyl-branded, and signage can carry your identity alongside the Victus payment instructions drivers need in order to start a session.

More questions and answers

Six fields, one minute. We only use your details to answer this enquiry — no marketing lists, no third parties.

Your car park is already full of EVs. They're just charging somewhere else.

Start with a fifteen-minute call. We'll tell you honestly whether your site is worth electrifying yet — and if it isn't, what would change that.